
At the moment, Anton Constructiewerken is busy making vehicle restraining barriers for the renovation of the Afsluitdijk. This involves sawing existing profiles to size, drilling holes in our drilling line and assembling barriers 4.6 metres long and 2.5 metres high.
The steel was dismantled by the client at a job in Zeeland and will be processed into steel barriers in Obdam, from where it will be shipped to Den Oever.