Anton Staalbouw realised a canopy on the Vattenfall site in Eemshaven on behalf of an on- and offshore crane specialist. The canopy serves as a prevention against corrosion of the crane system on a gantry crane.
Prior to the work, Harder Constructie- & Adviesbureau accurately mapped and measured the situation. After which the engineering of the canopy could be realised.