Support structure, stairs and fences for Antonie van Leeuwenhoek hospital

On the roof of the boiler house of the Antonie van Leeuwenhoek hospital 4 new dry cooler units have been installed with an operational weight of approx. 6.5t each. Anton Construction Work has made the supporting structure for this, including a new access staircase, various fencing and a slatted floor.

In total there was an additional load of 50t (dry coolers + steel construction) in the existing construction of the boiler house, that is why we have reinforced the existing construction on critical places by installing various steel constructions.

Anton Construction & Consulting Agency has taken care of the detailed calculations and the complete drawing work.