Cover Broek on Langedijk

Anton Construction & Concrete Engineering has made a cover in Broek op Langedijk. A concrete finish of a steel sheet of piles, so the water will be separated from the inhabitants’ gardens. The project has been deployed to make the underlying (new) residential areas more accessible by boat. The continuous route is at high tide level, the ditch in Broek on Langedijk was low water, so it had to be carried around the entire district. By raising the high tide, a new short route has emerged from the new building, along the shopping center to the 1000 islands.