Anton Air Support has been commissioned to modify 10 Passenger Bridges at Oslo Gardermoen Airport in Norway. The inner tunnels must be replaced and 1 Passenger Bridge must be totally replaced. The assignment takes a total of 7 months and is carried out in 2 phases. A great project for Anton Air Support
![](https://media.antoncdn.nl/sites/5/2018/01/Oslo-Noorwegen-ombouwen-pbb2.jpg)