Anton Air Support has fully refurbished this 27-year-old passenger boarding bridge.
Our technical specialists dismantled the complete 3-steel tunnel PBB, electrical and mechanical. We inspected the PBB before the dismantling and listed the materials that could be reused or must be renewed. We can also install several options, if requested by the client, like programming automatic docking, repainting the bridge in the colors requested by the client, mounting a GPU unit or a PCA unit brackets under the PBB, air conditioning in the bridge, and more.
Anton Air Support extended the life span of this refurbished PBB by 15 years!. We invested in sustainability (by reusing materials and new durable materials) and reducing the CO2 emissions, to contribute to our CO2 footprint goals for a greener environment and planet.