Work at Bolbrug

On the railway bridge between Alkmaar and Heerhugowaard there was proved to be a imposition incident. After exact measurements, Anton Rail & Infrastructure has adjusted the imposition on the bridge and abutments. This work was obviously done during a nighttime deactivation. The adjustment to the supports under the bridge were performed during the daytime and bridge opening.