Welding at rail bridge Akkrum

Anton Industrial Services took care of all the welding for project Railway Akkrum. It involved 22 rainwater drains to be drilled into an existing bridge and instal stainless steel drainage pipes. Anton Industrial Services has experienced and qualified welders. The welding was done under strict supervision of the client and on the basis of a WPS (Welding Procedure Specification).