Concrete floor (phase 3) at Schiphol International Airport

Anton Construction & Concrete Engineering has poured a concrete floor in the departure lounge 1 at Schiphol international Airport, which was commissioned by BAM Non-residential. This project was phase three of a total of four stages. All work has been executed at night.