Billboard and mast Alkmaar

Commissioned by Uptown Advertising the Anton Group realized a fifteen meter high billboard and mast in Alkmaar. It became a rush job. Only six weeks between the first line on the drawing board and the last bolt. Anton Construction & Consulting took the calculations and drawings upon themselves, Anton Construction & Concrete Engineering produced the concrete foundation, and Anton Constructions took care of manufacturing and assembly. And all within the agreed delivery time. A fine example of teamwork.