After the successful FAT (Factory Acceptence Test) in October this year, the SAT was executed in Barendrecht. The SAT (Site Acceptance Test) concerned the escape route system at 1 of the 92 emergency exit doors in the Barendrecht roof. Anton Rail & Infra B.V. has successfully carried out the SAT!
We have also carried out the engineering of the escape door system, which enables us to call ourselves a true tunnel specialist.