Grid platforms for boaters

In the summer of 2010 Anton Rail & Infrastructure built two platforms near the Bolbrug on the newly applied break works in Heerhugowaard. The platforms are designed for boaters who must report to a control center to obtain a bridge opening. The job is carried out with the help of barges. A truly custom project.