Replacing a bunker cross

For a client in Rotterdam, a worn bunker cross – which is used to separate various types of sand and gravel for the production of concrete – had to be replaced by a new one. Anton Industrial Services has taken care of this project from A to Z. After the engineering of the bunker cross and part of the manufacturing in the workshop, everything went to transport to be completed on location. The steel walls were welded onto the cross and coated. Also the whole cross had to be covered with rubber to prevent wear. The old bunker cross was cut out and sharpened. The new cross fitted perfectly and was welded on the spot.

The team of Anton Industrial Services has delivered a fantastic performance with a satisfied customer as a result.