Projects

Changing a transport system

9 September 2019

Anton Industrial Services has changed the transport system at a recycling company. We have placed magnetic tape and an extra steel construction and shortened the existing conveyor belt and provided it with a new connecting piece. The engineering and production were in the hands of our German colleagues from Stadler BV.

The work is planned in close consultation with the customer. All new holes were drilled in advance during a standstill. 2 weeks later all parts arrived and we could really work on it. After 3 long days, all parts were in place and the installation was operational. The customer was very satisfied.