In Eindhoven Anton construction is building a steel structure for the bus stop at the shopping center Woensel. A concrete foundation was poured. The time constrains involved with this whole project is a challenge. Within ten weeks, the entire structure must be finished. The foundation is a nice start.
![](https://media.antoncdn.nl/sites/4/2017/08/bushalte1-940x558.jpg)