After a collision with a sea-going vessel, the quay in Den Helder had to be repaired. As part of the repair, Anton Bouw & Betontechniek has realized a concrete floor and a deck cover. It was quite a challenge to mount the support during ebb and flow! But we did the job – of course – successfully.
![](https://media.antoncdn.nl/sites/4/2020/07/Herstel-zeekade-Den-Helder3.jpg)