“ Extending the lifespan of your existing PBB with more than 15 years. ”
Anton Air Support can extend the lifespan of the existing Passenger Boarding Bridge with more than 15 years
- Low investment
- Partial or Full Refurbishment
- Extending life span
- Today’s quality and safety requirements
- Reducing CO2 Footprint
- Contributing to a better sustainability
Refurbishment on a Passenger Boarding Bridge could involve a new bridge deck, upgrading the substructure, complete renovation including coating or adjusting the technical installation. We can also upgrade the existing operating system to the latest version (PLC) with the corresponding control panel.
The proces
- Listening, advising and discussing LoR (List of Requirements) with the client
- Inspecting the existing passenger bridges on site
- Inspectionreport including (detailed) photos
- Independent advice and recommendations
- Implementation and realisation
Extending lifespan and CO2 targets
Control systems on board passenger bridges vary from electro-hydraulic to electromechanical, and in some cases a combination of both. Anton Air Support can design a new and reliable system to extend the PBB life cycle by many years.
A small investment not only extends the life cycle of the PBB, but Anton Air Support, together with the client, also contributes to CO2 and environmental objectives. Renovation, environmental and social costs result in 38% lower costs compared to investing in a completely new PBB.