Anton Air Support is responsible for the project management and installation of 28 new passenger boarding bridges (PBBs), in cooperation with the bridge supplier and Brussels Airport. The project started in 2020, but due COVID, the project was delayed with 2 years.
All 6 phases consists of pouring a reinforced concrete structure for the rotunda column and the foundation for the Passenger Staircase Building (PSB). Depending on the design of the PSB, one or two PBBs will be connected to the PSB and connected to the terminal with one or two tunnels (Fixed Walk Way). The end of the project is scheduled early in 2027.
Anton Air Support has already successfully completed several projects at Brussels Airport (see construction A380).