By placing two boarding platforms at Central Station Lelystad it is no longer necessary that a train conductor has to jump the final stretch from the cabin. Anton Rail & Infrastructure installed these platforms during a brief outage, in collaboration with Van Doorn.
![](https://media.antoncdn.nl/sites/3/2017/08/lelystad-1.jpg)