Anton Construction works has extended an existing platform with 9 meters. Equipment will be placed on this extra piece of floor for climate control.
The frame is fully pre-assembled in our work hall. Then the frame went entirely on transport. With help of a tower crane, the complete frame was placed in the right place by our technicians and then assembled.
![](https://media.antoncdn.nl/sites/2/2017/12/Teeltbedrijf-A.jpg)