
The Julianaweg is one of the busiest roads in the entire municipality of Edam Volendam. The culvert located from the culvert bridge was leaking and the municipality asked for a solution to repair it without having to open the road. Repair of the culvert bridge is planned, the fear was that it would not last as long. The concrete culvert tubes were cracked to such an extent that injecting them was not an option. After investigation, Anton Civiel & Infra chose to insert a new plastic culvert pipe, not really an easy task given the surroundings. The gap between the old and new culvert pipe was then injected after which the entire culvert construction became a solid whole again. A nice custom job where our experts were given a free hand.