Placement of Culvert Syngenta

The project originated from a long-cherished desire to improve the internal logistics at the seed breeding company Syngenta in Enkhuizen. In the current situation, traffic situations were disrupted and blocked which often led to dangerous situations.
 
Anton Civiel & Infra was asked, as part of the improvement, to make a new route possible by installing a culvert in an existing waterway and to modify and fit the surrounding site paving and fixtures. The result is impressive and we look back on a fine cooperation!