45-metre conveyor belt replaced after 40 years in IJmuiden

After almost 40 years, it was time to replace 45 metres of heavy duty conveyor belt and one wear-resistant bulk overflow. In cooperation with the client from IJmuiden, Anton Industrial Services carried out this work.

After Anton Industrial Services’ engineering department had engineered all the parts to be replaced, they were produced. The client wanted to minimise production disruption, and only 72 hours were available for implementation.

Within this time, the old conveyor and overflow had to be removed and the new parts installed. With a team of experienced fitters, this was hard work, but the work was successfully completed and delivered within the stipulated time.