Especially for SwifterwinT and Vattenfall’s wind turbines, 24 ‘islands’ are being constructed between Lelystad and Ketelbrug. They serve as foundations for new offshore wind turbines. After extensive safety training, the foundations are poured and finished at sea by Loos Betonvloeren. A unique project in a unique location! Project details
- Project name: 24 Wind turbine poles
- Location: Trout trip at Lelystad
- Flatness: flattened on slope
- Size: 8,000 m2 / 20,000 m3
Activities/deliveries Loos Betonvloeren
- Pouring, finishing and post-treatment 24 Piling on water
The Windmill piles are poured on water in compliance with very strict safety measures. The concrete mortar is produced on water where it is poured into the pile by means of a concrete pump.