Anton Rail & Infra has completed and delivered the final phase of the project “Station Den Haag Hollands Spoor”. The work consisted of preserving the steel structure and replacing the sheet pile cladding of the platform roof along track 6.

The preservation work has been carried out in two phases. The paintwork in zone B and C were carried out during the day and zone A during a 52-hour shutdown. The platform roof of track 6 was also replaced during this shutdown. In cooperation with Anton Constructiewerken, a total of 190 meters of sheet piling has been replaced. Thanks to the good preparation and cooperation of various parties, the work was carried out satisfactorily.

Anton Rail & Infra has fully executed the project within the required 2 years and delivered it to ProRail.