Prefab secondary walls for Rotterdam Noord station

Anton Bouw & Betontechniek, in collaboration with Anton Rail & Infra, made and installed prefab concrete retention walls. We made the walls in all kinds of shapes: from round and rectangular to a triangle or cylinder with beam (see photos).

The walls are for finishing the steel sheet piling. The concrete walls are still covered with brick slips.

Renovation of Rotterdam North Station

Anton Rail & Infra is renovating, on behalf of ProRail, Rotterdam Noord station and making it more accessible for disabled people. For example, the ramp on the north side will be extended and flattened. On the south side, the ramp will be replaced by a lift.