Building a new bridge from 3D-design to implementation

Anton Construction & Concrete Engineering has built a completely new bridge in the new district Watergang. This bridge serves as a access route to the new neighborhood. It was both a design and construct assignment. From the 3D design and the construction calculation to piling and coating, everything has been carried out entirely by Anton Construction & Concrete Engineering. Given the weak soil where the bridge had to be placed, the construction was placed on poles. Subsequently, a concrete construction was made with a round wall, this special form immediately stands out. We have also provided the masonry and a deck of hardwood on steel beams.